单项选择题
Clamps have been used up, and we also need plenty of lashing wires.()
A.夹子已用完了,另外我们还需要大量的绑扎钢丝 B.绑扎钢丝已用完了,另外我们还需要大量的卡拉母 C.夹子已用完了,另外我们还需要大量的吊货钢丝 D.吊货钢丝已用完了,另外我们还需要大量的夹子
单项选择题 Liquid bulk cargo is loaded and discharged by pumps.()
单项选择题 I’ll ask the electrician to repair the winch. ()
单项选择题 There is something wrong with the winch at hatch No.2.()